Thursday, November 06, 2008
Wednesday, November 05, 2008
Living Room
Recent Pictures
Saturday, October 25, 2008
Progress
This french door pattern is going in the office double doors, the away room double doors opening into the living room, and this door, which is the away room opening up into the hallway. I designed this pattern, which is a mixture of two different stock designs. The wood is unstained right now, and the thermostat will be reattached after staining. :)
The living room, which is currently more like a wood shop. The spots in the picture are dust particles in the air.
Sunday, October 19, 2008
Tile Is In
Friday, October 17, 2008
Progress
Tuesday, October 14, 2008
Marching Band
Thursday, October 09, 2008
Progress in the Bathroom
This is the view of the new upstairs bathroom from the living room. The new cabinets were installed yesterday, and the headband trim today. The reddish paper is covering a black granite countertop. The left side, which you can't see, contains the stand-up shower and more cabinets. Even though it doesn't look like it in the picture, the cabinets are a lighter stain than the kitchen cabinets. The layout of this bathroom turned out really well. The toilet will go behind the far wall on the left side of the vanity.
Staining Redeemed
The new staining crew started working in the basement this week. We are thrilled with the results of their work. They have a more complex process than the previous crew: they wipe on the stain, seal the wood, spray on the stain (color can be adjusted at this point, which is what we had to do), and then lacquer. The wood is richer and darker. Most of the problem areas have gone away or aren't noticeable unless you know where to look. Changing crews was absolutely the right decision. Our builder did a good job of finding a crew that is capable of dealing with the fussy poplar wood, and that dealt with the tricky situation of coming in after another crew had started. The crew finishes staining in the basement tomorrow and then they start painting.
Saturday, October 04, 2008
Window Seat
The headband runs across the upper portion of the window seat. The big white drywall patch on the left will get repainted. :) The wood will be stained the same color as the kitchen cabinets. We will cover the 5-inch thick cushion we've had here previously with fabric to match the paint. This will be the prized, most-sought after spot in the house after it's finished.
The slanted back is for leaning against when lounging or reading in the window seat. The opening above the backrest has adjustable shelves, which are stacked up in the bottom of the opening until they are stained.
Friday, October 03, 2008
Lockers in the Entryway
Behold the unstained locker area in the entryway. The wood will be stained the same color as the kitchen cabinets. When I walked in the house after this area was finished, I realized that we have reached a monumental moment in our house remodel. The first headband board (the board between the lower and upper parts of the wall that that separates the two different colors) had been installed. We have gotten so many questions about why we didn't "finish" painting all the way up the walls. Even this week, the guy who is working on drywall in the bathroom assumed that the person painting was just too short to reach! You can see in this picture that the headband board runs across the top of the door and then around the lockers. The headband will be everywhere in the main floor except around the kitchen.
Subscribe to:
Posts (Atom)











