Sunday, September 28, 2008
Wednesday, September 24, 2008
Isaac Plays Goalie
More Pics
Pictures Around the House
The cabinets are installed around the stairway. The railing, which will be made from slate tiles with a wood band around the edge, will sit on top. The railing will be a little more than 12 inches wide.
Thursday, September 18, 2008
House Pics
Finally all the kitchen cabinets are hung. Well....there are still 4 to install around the stairway, but they don't count as the original cabinets that we got over a year ago.
The four cabinets mentioned above will be installed around the stairs and those temporary shelves will be gone! In this picture you can also see the bathroom that was gutted where the bare studs are.
This is the most startling and exciting change today. The hole from the living room to the away room (our former bedroom) was cut. What a change! I can't wait until the double french door with glass are installed. The doors for the upstairs are 2 weeks away.
Stain Update:
We got a bid today from a staining crew that is much more reasonable that the last number that we got. We will be looking at some of the crew's work and having them stain some sample boards for us. Hopefully they will work out. We're getting closer to a solution on that.
Wednesday, September 17, 2008
House Update
Still no answer on the staining fiasco. The other crew we brought in was way over budget, unfortunately. So we are exploring other options. One guy came today to look at it, and will get numbers soon, and I'm working on getting another guy here this week.
Progress on the bathroom and bedroom demolition is complete, and Mike is doing electrical this week (he took off three days). I'll try to post some pictures of that soon (I've got to find my camera and the cable to connect it to my laptop). I'm so glad we're not living in the house right now - what a mess!
Progress on the bathroom and bedroom demolition is complete, and Mike is doing electrical this week (he took off three days). I'll try to post some pictures of that soon (I've got to find my camera and the cable to connect it to my laptop). I'm so glad we're not living in the house right now - what a mess!
Muddy Football Game
Thursday, September 11, 2008
Big Changes
Over the course of the last week we have decided, with our builder's strong recommendation, to temporarily move out of our house for the next 6 to 8 weeks. We are moving to a house 2 doors down which is sitting empty right now. It is up for sale, but the with the tough market, the owners aren't optimistic about it selling anytime soon. They have agreed to let us stay there (we're paying them rent) until our house is done. Our builder tells us that by moving out and allowing them to start on the upstairs this next week, we can shave at least 2 weeks off the finish time of the project overall.
This all came about because of a fiasco with the staining that happened on Monday. We were very unhappy with the job the crew did (our builder brought in a sub that he uses). We decided, in conjunction with our builder, to dismiss the staining crew, and bring in another one, which we found through a friend who works for a staining/painting crew (thanks, Jeff!). We are waiting to find out if the bid from the new crew will be within our budget. They will need to do some fixing of the sloppy job the first crew did, and then they will be able to do the staining from scratch upstairs. Due to this situation, we would have been 3 weeks behind schedule on the basement because the new crew couldn't start work for another 3 weeks. However, if the work commences upstairs during that time, and catches up with where the basement is, then we will save money overall by bringing in the remaining crews all at once time instead of twice, and we save about 2 to 3 weeks overall. We are now hoping for a finish date of early November instead of late November.
So.....we are frantically packing up and will be moving over the next few days. Thankfully, I don't have to go into work tomorrow (classes are cancelled from 10 to 1 due to inaugural ceremonies for the new president) so I can work at home all day. Mike is taking a half day, and we will begin to empty our bathroom and bedroom on the main floor. Our builder wants to start the demolition process in the bathroom upstairs (it's being gutted and totally redone) and our bedroom (the closets get removed and the room changes to a TV room). Then the crew will begin to catch up the upstairs to where the basement is right now (trim, casing, and baseboards are finished, cabinets installed, built-ins are constructed) by bringing back the finish carpenter right away. Then he will bring in the staining and painting crew, then the tile guys, then the finish plumbers, then the wood flooring and carpeting guy to do the whole house instead of doing it in parts.
We'll keep you updated, but assume for the next 6 to 8 weeks that you should call our cell phones. We will have internet access at the new place. We are bringing minimal furniture, bedding (air matresses), bathroom, and kitchen supplies. The nice thing about this whole situation is that we will have a space that isn't going to be disrupted every day by workers arriving at 7:00 am, dust and fumes flying around, and the chaos of a remodel.
This all came about because of a fiasco with the staining that happened on Monday. We were very unhappy with the job the crew did (our builder brought in a sub that he uses). We decided, in conjunction with our builder, to dismiss the staining crew, and bring in another one, which we found through a friend who works for a staining/painting crew (thanks, Jeff!). We are waiting to find out if the bid from the new crew will be within our budget. They will need to do some fixing of the sloppy job the first crew did, and then they will be able to do the staining from scratch upstairs. Due to this situation, we would have been 3 weeks behind schedule on the basement because the new crew couldn't start work for another 3 weeks. However, if the work commences upstairs during that time, and catches up with where the basement is, then we will save money overall by bringing in the remaining crews all at once time instead of twice, and we save about 2 to 3 weeks overall. We are now hoping for a finish date of early November instead of late November.
So.....we are frantically packing up and will be moving over the next few days. Thankfully, I don't have to go into work tomorrow (classes are cancelled from 10 to 1 due to inaugural ceremonies for the new president) so I can work at home all day. Mike is taking a half day, and we will begin to empty our bathroom and bedroom on the main floor. Our builder wants to start the demolition process in the bathroom upstairs (it's being gutted and totally redone) and our bedroom (the closets get removed and the room changes to a TV room). Then the crew will begin to catch up the upstairs to where the basement is right now (trim, casing, and baseboards are finished, cabinets installed, built-ins are constructed) by bringing back the finish carpenter right away. Then he will bring in the staining and painting crew, then the tile guys, then the finish plumbers, then the wood flooring and carpeting guy to do the whole house instead of doing it in parts.
We'll keep you updated, but assume for the next 6 to 8 weeks that you should call our cell phones. We will have internet access at the new place. We are bringing minimal furniture, bedding (air matresses), bathroom, and kitchen supplies. The nice thing about this whole situation is that we will have a space that isn't going to be disrupted every day by workers arriving at 7:00 am, dust and fumes flying around, and the chaos of a remodel.
Saturday, September 06, 2008
Play Room
The carpenter has his tools set up in the play room. This is the last room that he will work on. He will put a railing on the loft (bottom picture) and build a window seat in the front window (not pictured here). I'll post those pictures as soon as he finishes.
Shower Tile
The porcelein tile in the shower turned out really well. They are waiting for a mosaic to come in, and then they can finish.
View of Hallway
This is the view from the playroom looking down the hallway toward the boys' room. The carpenter installed the shelving between the cabinets, which will be stained to match.
Emily's Window Seat
The carpenter finished Emily's window seat today. It is made out of maple and will be left a natural color and finished. We will get some pillows for leaning on the sides - that's why the shelves start up higher. One of the cabinet doors isn't hung yet because KraftMaid didn't send hinges for those doors when we ordered them. We found 3 kitchen doors that had been replaced that still had hinges on them, so we used those and then ordered one more hinge, which will hopefully be here soon. I love this seat - it looks so nice even though it's not varnished yet.
Sunday, August 31, 2008
More Detail for the Interested
This picture shows the trim detail. The bottom board is thicker than the side boards, which creates some interest, but also makes the butt joint look better than if the boards were the same thickness. There will be no miter joints anywhere in the trim or cupboards. The trim is poplar which will be stained the color of our kitchen cabinets.
Construction Pictures
It's hard to take pictures right now because the progress is less dramatic, and until the painting is done, the drywall is not very photogenic. The top picture is of a closet door in the lower entryway. You can also see the baseboard. The bottom picture is the window in the playroom looking toward our neighbors' house. The top and bottom of the window are trimmed the same as the top of the door.
Saturday, August 30, 2008
Subscribe to:
Posts (Atom)



